home » Building Survey

Building Survey

The term building survey can mean different things to different people. Below is a partial list of how different professionals may use the term.

Architects, Drafters, Engineers, etc.

Def.: The act of field measuring an existing building, in order to create a drawing of it.

A floor from an architectural building survey.
A floor from an architectural building survey.

This type of building survey is typically simple and created from measurements taken with a hand held laser distance measuring device and hand held tape measure.

Building surveying of this type is basically a trade. Therefore it could be performed by someone who has the understanding of what would need to be documented, and who has the skill to accomplish it. Such qualifications often times come through working in the AEC industry.

Historic Preservationists

Def.: The process of documenting the nation's historic architectural, engineering and landscape features.

The preservation program HABS (Historic American Building Survey) uses the term in the manner above.

Surveyors

Def.: The act of field measuring a building by employing the techniques and standards of a licensed Surveyor, in order to create a signed and sealed drawing of it.

A building survey of this type may require the use of surveying equipment such as a level, theodolite, total station, and tripod. Conversely, to reiterate, the field work for a building survey of the first type would simply consist of taking measurements of a building using a hand held laser distance measuring device and a hand held tape measure.

Contact

If you have a building survey project that needs doing, then please feel free to call the New York City based CAD Consultant Brian M. Curran today to discuss it. He could explain the measuring and CAD process, discuss the logistics of site access, talk about budget and schedule, and more. Call Now: 718.441.3968 or email at: brian@draftingservices.com

Share this web page
Clients Have Commented

... Thank you many many times for completing all this work so fast. Jay E. Butler, PE, February 26, 2009

... with all the great work you have done for us. Nolan R. Rogers, Turner Construction Company, April 8, 2010

... Thanks for the fast work. Adele Finer, AIA, LEED AP, July 28, 2010